Concrete slab needs to be leveled ready for carpet.

Claire requested 3 quotes from Floorers in Malvern East

  Bathroom stripped out and now there is a hole in the concrete slab from where the bath was removed. Th hole to be filled is aprox 1500mm X 1000mm. After this is filled the entire floor aprox 3000mm X 4000mm needs to be leveled as it is uneven after tiles where removed, made ready for carpet.

Quote Details

  • Suburb Malvern East, VIC 3145
  • Specialisation Self Levelling Flooring
  • Date Listed 26 May 2011 - 9:04 pm

Similar Quote Requests

Fill a hole in the concrete slab & make the slab even, ready for carpet
Bathroom has been stripped out and there is a hole in the concrete slab from...

Decorative polishble self levelling overlay
75 to 80 square m2 of floor space to cover I have taken floor tiles up in my...

Concrete Polishing
Required for 2 rooms approx 5x3metres and 4 x 3metres.

STRIP FLOORING BACK, PAINT IT AND SEAL IT.
STRIP FLOORING BACK, PAINT IT AND SEAL IT. (SANDBLAST)