Claire requested 3 quotes from Floorers in Malvern East
Bathroom stripped out and now there is a hole in the concrete slab from where the bath was removed. Th hole to be filled is aprox 1500mm X 1000mm. After this is filled the entire floor aprox 3000mm X 4000mm needs to be leveled as it is uneven after tiles where removed, made ready for carpet.
Fill a hole in the concrete slab & make the slab even, ready for carpet
Bathroom has been stripped out and there is a hole in the concrete slab from...
Decorative polishble self levelling overlay
75 to 80 square m2 of floor space to cover I have taken floor tiles up in my...
Concrete Polishing
Required for 2 rooms approx 5x3metres and 4 x 3metres.
STRIP FLOORING BACK, PAINT IT AND SEAL IT.
STRIP FLOORING BACK, PAINT IT AND SEAL IT. (SANDBLAST)