Claire requested 3 quotes from Floorers in Malvern East
Bathroom has been stripped out and there is a hole in the concrete slab from where the sunken bath was removed. The hole to be filled is approx 1500mm X 1000mm. After this is filled, the entire floor approx 3000mm X 4000mm needs to be levelled as it is uneven after tiles were removed, to be made ready for carpet.
Concrete slab needs to be leveled ready for carpet.
Bathroom stripped out and now there is a hole in the concrete slab from where...
Decorative polishble self levelling overlay
75 to 80 square m2 of floor space to cover I have taken floor tiles up in my...
Concrete Polishing
Required for 2 rooms approx 5x3metres and 4 x 3metres.
STRIP FLOORING BACK, PAINT IT AND SEAL IT.
STRIP FLOORING BACK, PAINT IT AND SEAL IT. (SANDBLAST)