Fill a hole in the concrete slab & make the slab even, ready for carpet

Claire requested 3 quotes from Floorers in Malvern East

  Bathroom has been stripped out and there is a hole in the concrete slab from where the sunken bath was removed. The hole to be filled is approx 1500mm X 1000mm. After this is filled, the entire floor approx 3000mm X 4000mm needs to be levelled as it is uneven after tiles were removed, to be made ready for carpet.

Quote Details

  • Suburb Malvern East, VIC 3145
  • Specialisation Self Levelling Flooring
  • Date Listed 24 Feb 2011 - 8:33 am

Similar Quote Requests

Concrete slab needs to be leveled ready for carpet.
Bathroom stripped out and now there is a hole in the concrete slab from where...

Decorative polishble self levelling overlay
75 to 80 square m2 of floor space to cover I have taken floor tiles up in my...

Concrete Polishing
Required for 2 rooms approx 5x3metres and 4 x 3metres.

STRIP FLOORING BACK, PAINT IT AND SEAL IT.
STRIP FLOORING BACK, PAINT IT AND SEAL IT. (SANDBLAST)