Yellow tongue particle floorboard needs to be levelled

Dennis requested 3 quotes from Floorers in Murarrie

  The carpet has been taken up on our stairs to the 2nd level + the L shaped hallway. Plan is to have laminate installed on the stairs & hallway. The stairs are ok to proceed but there are 2 high spots in each of the L hallway sections of the existing yellow tongue particle board flooring. The installers came out for a look at the floor on Saturday with their straightedge & recommended that we get the floor levelled before they put the laminate down in the hallway. The high spot in one section is about 15mm higher than the floor at the walls.

Quote Details

  • Suburb Murarrie, QLD 4172
  • Specialisation Self Levelling Flooring
  • Date Listed 20 Feb 2017 - 1:26 pm