Marwin requested 2 quotes from Formworkers in St Kilda East
Require pouring of concrete of around 15 floating steps (900 x 240 x 100).
Formwork is there already.
Completed asap thanks.
Steel fixing for house slab extension
Fix steel-Y 16's & ligs for slab beams.Job in Elwood
NEEDING CONCRETER WITH SMALL MIXER TO FILL WATER BARRIERS WITH CONCRETE
NEEDING CONCRETER WITH SMALL MIXER TO FILL WATER BARRIERS WITH CONCRETE
Require concrete plinth built approx 400mm high,also req 2 concrete pads 400x400
Need a concrete plinth approx 400mm high on which a cast iron pickets...
Concrete Stairs
Require pouring of concrete of around 15 floating steps (900 x 240 x 100)....