Dig a pit in a 200mm thick cement reo factory floor 4m x 5mx 600mm

John requested 3 quotes from Formworkers in Mount Waverley

  I require a quote on a concrete pit to be dug in our floor 5m x 4m x 600mm Deep. The floor is 200mm reinforced cement.
- It would require a concrete cutter and the forming of the new pit.

Formworkers that Responded

VIKING Structures

Concure Concreting

NDA Logistics

Quote Details

  • Suburb Mount Waverley, VIC 3149
  • Specialisation Formwork Concreting
  • Date Listed 16 Oct 2007 - 6:47 pm

Similar Quote Requests

3m x 2.2m concrete pad for generator
need a 3m x 2.2m concrete pad for a generator at a hospital.

3 levels suspended slab
Carpark for 20 car spaces, 3 levels of suspended slab with columns Plans can...

Replace concrete footpath bays and required new concrete slab for water ta
Need to replace 6 footpath bays.Dimensions: 4 bays 1350 X 1350 mm approx....

Repair to concrete balcony it is cracked on the surface
There is a concrete slab balcony with a crack in the surface, this needs...