Bryce requested 3 quotes from Formworkers in Kareela
Form up suspended concrete slab approx 7mx7m incorporating 2 400x400 concrete beams. May need scaffolding - Formwork props etc. will have to remain for a month before stripping
Retaining wall foots required
Strip Footings required for retaining wall. R6 ties at 900. 4 - L12 TM.
Formwork to Suspended Deck
55m2 Suspended Deck with Perimeter Hob
Concrete Slab for a garage/shed. 6m/5m.
Concrete Slab for a garage/shed. 6m/5m.
Not sure if I need to do prep. Need...
Piering, concrete foundation frp of slab
New home. Need a contractor to take on the foundation works package....