Formwork for two floating slabs

Colin requested 3 quotes from Formworkers in Kareela

  Two floating slabs need to be formed up for garage floor and decking. Both around 36m2 in area. Site ready to go in 2 weeks. Could use condek/bondek as alternative if cheaper.

Formworkers that Responded

Auspec Building Services

Quote Details

  • Suburb Kareela, NSW 2232
  • Specialisation Formwork Concreting
  • Date Listed 29 Jan 2013 - 1:22 pm

Similar Quote Requests

Retaining wall foots required
Strip Footings required for retaining wall. R6 ties at 900. 4 - L12 TM.

Formwork to Suspended Deck
55m2 Suspended Deck with Perimeter Hob

Concrete Slab for a garage/shed. 6m/5m.
Concrete Slab for a garage/shed. 6m/5m. Not sure if I need to do prep. Need...

Piering, concrete foundation frp of slab
New home. Need a contractor to take on the foundation works package....