  Da requirement: 5 cu m onsite stormwater detention pit which has been designed by an engineer - copy of plan available.
pit sits alongside small access driveway and the lid will form part of driveway.

job anticipated within 8 - 10 weeks from 4 august 08 as construction of house about to begin.

require pricing and construction timeframe as wish to settle the job.

Formworkers that Responded

Davform

Quote Details

  • Suburb West Pennant Hills, NSW 2125
  • Specialisation Formwork Concreting
  • Date Listed 4 Aug 2008 - 10:38 am

Similar Quote Requests

Need a concrete slab for a garden shed 3m by 1.5m
We need a concete slab 100mm deep for a garden shed with dimensions 3m by 1.5m.

Ceiling installation about 15 rooms
ceilings to be installed house being renovated 15 rooms

Remove internal wall, roof need bracing
Removal of an internal wall on the ground floor of a terrace house. the wall...

Attic room in roof
I would like to make an attic storage area in the roof cavity of our house...