Ashok requested 2 quotes from Gardeners in Point Cook
Rotary hoeing apx 30 sqmts in the backyard to prepare the ground for new lawn. easy access via roler door through double garage. would be a 20min job. requires to be done this saturday or sunday (27/09/2008 or 28/09/2008)
ROTARY HOEING TO MOST OF BACK YARD
ROTARY HOEING TO BACK YARD
Rotary hoe front garden
Area is approx 5m x 6m of clay soil. Grass has been scrapped back by bobcat.
Rotary hoeing required for front lawn and possibly back as well
Rotary hoeing required for front lawn. We have very clay soil. Possibility of...
Rotary Hoe front and back yard as full of clay
Rotary hoe front & rear of home as full of clay