Darren requested 2 quotes from Handymen in The Basin
Require a brick wall after a air conditioner removal.Require to brick up a wall were ducted heating previously located.Create a hole in the brick wall for access to underneath the house.
Removal of fireplace and hearth
Removal of hearth tiles and fireplace face then closing over the fireplace.
Suplly&replace 5 brick steps to backyard,on a slope,easy access
replace 5 steps made of brick out the back of house,single story,located on...
Brick/Stone Steps from ground to verandah
Building a brick/stone steps/stairs from ground to verandah at building...
Paver walkway around new 3BR Unit/House
Newly constructed 3 bed room unit requires Brick/Paver pathway built around...