Handyman to replace some floorboards and partical board flooring

Steven requested 3 quotes from Handymen in Greenwich

  Part 1: Looking to get new carpet laid and before I do it I want to get the floorboards fixed of loose boards etc.
Part 2: There was minor water damage and it has damaged some of the partial board flooring. So it needs re-sheeting.
Its probably a half a days work. Can all be completed indoors so ideal job when its raining outside.

Quote Details

  • Suburb Greenwich, NSW 2065
  • Specialisation Basic Carpentry
  • Date Listed 18 Jun 2013 - 9:16 pm

Similar Quote Requests

Fly screen
replace broken flyscreen on sliding door - remove and attach current...

Replace small portion of timber floor
Replace approx 1m2 of timber flooring which needed to be previously removed...

Need three gyrock walls to be built
Need 3 gyprock walls to be built - to divide lounge into two rooms, to close...

Chipped polyurethane cupboard repaired
I have a chipped polyurethane cupboard i need repaired