Cameron requested 2 quotes from Handymen in Cherrybrook
Remove existing broken letterbox, re-level site, cement support rods, position 3 stone letterbox pieces and join with liquid nails or similar. installation instructions available @ http://www.stonecrete.com.au/installation.htm
Flooring in parts of the bedrooms needs to be resurfaced and levelled.
We are about to recarpet our bedrooms. When we pulled up the old vinyl...
Install new Stonecrete letterbox
Remove existing broken letterbox, re-level site, cement support rods,...
Touchup rendering and painting front door steps
Concrete steps to the front door requires touch up rendering & paint. Also...
Concrete Slab 760 x 1850
I need a concrete slab laid 760 x 1850 for a bikebox shed.
See link for...