Anthony requested 3 quotes from Handymen in Dandenong
Concrete floor to existing room that has asphalt surface with 150mm raised concrete edge.
Need to concrete over asphalt and concrete new 150mm concrete edge on top of existing edge to be used as a bund to capture oil spills.
Concrete edge must be poured at same time as floor so there are no seams between concrete edge and concrete floor.
A concrete ramp will need to be poured as well for fork lift traffic.
As part of company capital policy 3 quoats are required.
6m wide x 8m long x 150mm thick
All Safe Foundations
Fixing concrete
we have a hole in the unloading bay that needs to be filled back up with...
Concrete a 4 x 5 meter courtyard
concrete a partially concreted courtyard
Small concreting job - little ramp needs to be created
Small concreting job - little ramp needs to be created at a shop in Dandenong
SMALL JOB Concreting - existing one step off porch to be made into 2? steps
There is one concrete step going from a concrete porch onto a pathway. Step...