UPSTAIRS. CUT THE PLASTER FROM DOWN STAIRS CEILING TO GET TO THE PIPES

SAM requested 3 quotes from Handymen in Doncaster East

  UPSTAIRS. CUT THE PLASTER FROM DOWN STAIRS CEILING TO GET TO THE PIPES

Handymen that Responded

Pala Maintenance

Quote Details

  • Suburb Doncaster East, VIC 3109
  • Specialisation Shower Base Replacement
  • Date Listed 24 Apr 2007 - 6:10 pm

Similar Quote Requests

QUOTE- Replace Shower Base
The shower base has previously had a crack sealed however the water leak is...

Shower base to be replaced and Tiling to be fixed
Shower base to be suppliede and replaced and Tiling to be fixed

NEW SHOWER BASE. INC. TILES.
INC. TILES.

REPLACE MARBLE SHOWER BASE
REPLACE CRACKED MARBLE SHOWER BASE. ABOUT 12 TILES TO BE REMOVED AND REPLACED.