Peter requested 3 quotes from Landscapers in Southport
soil to be pumped over 800mm retaining wall.one side10m by 4.5m easy access .other side need approx 25to 30m of hose to reach 10m by 4.5m area of same retaining wall height
Soil moved from front to rear of house 6m3
6m3 of top soil moved from front garden to rear garden through garage
Soil blowing
new retaining wall is in and need soil in for new lawn as well as garden...
APPROX 52 SQ METRES OF PAVING TO BE LAYED
15 sq mtr of paving to be lifted.
2 carports approx 15 sq mtr each to be...
Retaining wall
Approx. 30m retaining wall using concrete sleepers, existing wooden one...