Paving front 3 metres x 3 metres

Peter requested 2 quotes from Landscapers in Chelsea Heights

  paving required in front approx. 3 metres x metres and bit of path

Landscapers that Responded

Pompave

All Aspects Plumbing

Quote Details

  • Suburb Chelsea Heights, VIC 3196
  • Specialisation Paving & Stonework
  • Date Listed 24 Sep 2007 - 10:16 am

Similar Quote Requests

PUT DOWN PAVERS IN BACKYARD
ROUGHLY BETWEEN 12-20 PAVERS 3/4 SQ FT

Pave front yard approx.8 x 7 on concrete base
Pave front yard on concrete base approx 8m x 7m

Sm area, pave over existing concrete, approx. 4 x 1.5m
Pave a small area in back garden , paving will be over existing concrete....

Paving repair
Mid section of brick paved driveway has become loose. Bricks are on a...