Giovanni (John) requested 3 quotes from Landscapers in Bridgeman Downs
2 Jobs.
1. Approx 3 metres of fill with then about 1-2 metres of pebble/rock topping. Some general planting.
2. Approx 20 mtres timber retaining, then requiring soil fill. Only one timber paling high required. More pebble/rock topping.
Steps from patio to pool area built, garden areas round steps
Need some steps from patio to pool area built, maybe out of sleepers. Garden...
Install steps, gardens and footpaths
Install steps in front yard from fence line to front door of house.
-...
Replace sandstone steps up along the driveway with concrete steps
Remove and replace existing uneven sandstone steps with pebbled concrete...
Landscaping
Hello,
We are looking for a landscaper to create and plant two garden beds...