Plastering in bathroom & storage room

Bruno requested 3 quotes from Plasterers in Box Hill South

  Currently bathroom has 1.5m high imitation tile board around room. This is to be cut out and replaced with plaster/villaboard, so it is level with the rest of the wall to make it ready for tiling. Total area to be replaced is 7sqm.

As separate quote: a storage room ceiling (4.5m x 1.4m) and louvre window area (1.5m x 1,) requires plastering

Plasterers that Responded

Hire A Hubby

GRAND BUILDING CO. PTY LTD

Quote Details

  • Suburb Box Hill South, VIC 3128
  • Specialisation Dry Wall
  • Date Listed 9 Sep 2009 - 11:03 am

Similar Quote Requests

COVER OLS SKY LIGHT HOLES IN ROOF
COVER OLS SKY LIGHT HOLES IN ROOF

REPAIR PLASTER
REPAIR PLASTER

Remove old fiber board install new plaster sheeting 5.5m x 9m
The area is 5.5m x 9m with two steel reinforcement beams across the room. we...

Apply & Plaster gibrock sheets (approx 9) to newly built room (walls only)
Apply Plaster board sheets (approx 9) to newly built room (walls only) and...