Plastering of - hallway arch, post wall removal, old doorway + cracks

Kev requested 3 quotes from Plasterers in Alphington

  Three components:
1. Arch in hallway needs to be made symmetrical and period trims and corbels added.

2. Having a builder remove a wall between kitchen and dining room on Tue 10th - have different ceiling heights so plaster return required creating a bulkhead + 1 nib wall + plaster up of old doorway (stud wall being put in by builder). Builder can hang sheets but need them to be finished off.

3. Plenty of cracks around house to be patched up

Plasterers that Responded

sp plasterworks

Brilliant job from Om and his team Very professional and great result! I will be asking them back when I get to renovating the other half of the job.

· over a year ago

Hire A Hubby

MWM plastering

Quote Details

  • Suburb Alphington, VIC 3078
  • Specialisation Period Homes & Buildings
  • Date Listed 5 Jun 2014 - 1:52 pm

Similar Quote Requests

Major plastering on 3 bredroom period home
four rooms and entrance way. room one-4.4x3.7, Room two-4.4x3.7, room...

Plaster works-had extension done lst yr-joins coming through & no expansion joints
I have had a new extension done last year and the plaster the builder use did...

Textured plaster required where old aircon unit was removed from wall.
Textured plastering required on a patch of wall where old airconditioning...

PLASTERING- 3 BEDROOMS AND HALLAWAY AND LOUNGE ROOM
PLASTERING- 3 BEDROOMS AND HALLAWAY AND LOUNGE ROOM