Robyn requested 2 quotes from Plumbers in Silverdale
Connect one downpipe on one side of the shed to the other approx 9 mtrs away, then connect both to the main storm water line approx 14 mtrs away. Lay a box drain approx 7 mtrs long adjacent to the down pipe and connect this into the stormwater as well.