Steve requested 3 quotes from Plumbers in Altona
We have recently had an outdoor bbq installed and we require the following to be completed to make it operational:
· Extend Hot and Cold services approx. 1.2 metres (outlets currently capped)
· Extend waste approx. 1.2 metres
· Hook up outdoor sink to Hot/Cold Mixer and connect waste
· Convert BBQ to Natural Gas (We have the Conversion Kit)
· Hook BBQ up to Gas Point (Female Bayonet fitting required)
Wade Pham Pty Ltd.
Leaking pipe
I have water accumulating in a localised area under the house, so I suspect...
Gas connection to stove cooktop
Freestanding cooktop/oven being installed and require gas connection
Roof leaks in a metal roof in a factory
roof leaks in a metal roof in a factory
Plumbing required for new dishwasher
Plum in a meile dishwasher, i have a powerplug fitted just need piping done