Shobhit requested 3 quotes from Plumbers in Box Hill South
Works are required as per this sketch in pink. Pit B (inclusive) to discharge point in 1 Hill Street. Pits A and B including removal/rectification of Driveways, Footpath and Council nature strip, as per Engineered Drainage Design. Including hydro excavation due to TPZ zones.
J.O Plumbing
NEW STORM WATER TO RESIDENTIAL
NEW STORM WATER TO RESIDENTIAL PROPERTY
COLD WATER RENEWAL FROM MAINS TO HOUSE
COLD WATER RENEWAL FROM MAINS SUPPLY TO PART OF HOUSE
STORM DRAIN TO BE INSTALLED.
STORM WATER DRAIN TO BE INSTALLED- A NEW PROJECT. A PART OF IT WILL BE UNDER...
Install 600mmx 600mm stormwater pick and connect damaged drainage into pit,
Install one new 600mm x 600mm stormwater pit at back of the kindergarten,...