Travis requested 3 quotes from Plumbers in Frankston South
Currently bathrooms are pulled back to frame. Require a plumber to finish off the rough in to allow plaster work to continue. This includes:
1. Ensuite: Connect two copper pipes to existing hot and cold water lines with T intersects for each.
2. Ensuite: Terminate these two copper pipes (tails for hot and cold outside/external to house)
3. Main Bathroom: Change configuration of pipes in main bathroom to go below floor.
4. Review and plan for other works (installation of hot water system including gas line).
Twin Electrics and Plumbing
NK Plumbing & gas fitting pty ltd
Install a dishwasher
Will also require a kitchen cupboard and doors to be removed, access to a...
PLUMBER TO JOIN KITCHEN SINK TOGETHER
PLUMBER TO JOIN KITCHEN SINK TOGETHER
Install Electric Water Heater
I have an on demand gas water heater LPG Gas. I am looking at getting an...
new Plumbing of factory
Installing new kitchen/laundry installing shower reposition toilet and hand...