Plumber for sewer and storm water pipes connection

Andrew requested 3 quotes from Plumbers in Stretton

  My land will be subdivided in the future, but now I am still not sure when I will do it. As I know that as long as we subdivide the land, I need to have new Sewer & Storm Water connection for the new lot, which will be the front part of the land, before I do the landscaping for our current property, we would like to pre-connect the sewer and storm water pipe for future subdivision, therefore when we subdivide the land in the future, the landscaping will not be destroyed. The length of pre-connect sewer and storm water pipes are approximate 28m long.

Quote Details

  • Suburb Stretton, QLD 4116
  • Specialisation New Drains
  • Date Listed 3 Mar 2012 - 10:27 pm

Similar Quote Requests

Drainage required to be connected to stormwater
We are looking for someone who can help us with some drainage. When it rains...

I need a spoon drain
The spoon drain needs to be about 50m in length. The area, where the spoon...

Require drainage installed
we have a low point at front of house which needs a drain to divert waterflow...

New ensuite
We want to install the plumbing and drainwork for a new ensuite in an...