Andrew requested 3 quotes from Plumbers in Monbulk
Bathroom Reno. Plasterboard is removed. Change 2x taps in shower to Mixer. Add Mixer pipes for new vanity. Laundry: move Washing machine stop taps down lower. Kitchen Move Hot and cold water pipes in to wall cavity. Plaster removed already throughout Move or extend gas pipe about 1m for new cooktop.
Water Save Plumbing and Property Maintenance
Made a time for him to show up to quote twice. Never showed either time. Never heard back.
New Bathroom
New Bathroom
SEPTIC TO CHANGE OVER TO REGULAR SYTEM
SEPTIC TO CHANGE OVER TO REGULAR SYTEM
Install two showers (1200x600) move existing plumbing.
Install two showers, 1200x900 and move exisiting plumbing. water needs to...
Install shower unit
Install shower unit - base & walls. Existing plumbing - may need to move...