Rectification of the installation of a gas ducted heater

Stephanie requested 3 quotes from Plumbers in Lower Plenty

  To reconstruct the ductwork installation to comply with AS 4254.1—2012, to reconstruct the flue so it does not have backfall to the flue terminal, to seal all walls in return air plenum box and check sizing of return air grills, to resize the gas line and to issue a compliance certificate. Work to be performed this Friday 8.7.16.

Quote Details

  • Suburb Lower Plenty, VIC 3093
  • Specialisation Plumbing Installations
  • Date Listed 5 Jul 2016 - 2:46 pm

Similar Quote Requests

Renewal of water service required ASAP
My home has very little water pressure. I believe that all the water pipes...

Plumb a new dishwasher and modify cabinets to fit it
we require: -modification to our kitchen unit to accommodate a fisher &...

INSTALL A HOT/COLD TAP IN A KITCHEN
N/A

Install taps
Install Hot/Cold water taps in Kitchen