Radu requested 4 quotes from Plumbers in Randwick
Renewal of sewer on left hand side of building (aprox 15m)
Excavate and remove concrete from site
Remove existing v.c. pipework and replace with p.v.c pipe and fittings
Make connection to existing boundary trap
Reinstate concrete (10 m)
Sydney Quality Plumbing
Aussie Plumbing
Taskforce Plumbing Green Earth
Install & install drainage grate connect to existing drain
install & install drainage grate at end of side pathway at back of house to...
Fix leaking tap & flooding shower drain
Bathroom 1: bath tap leaks hot water. im guessing a new washer is needed?...
All aspects of plumbing
all maintainence ,hotwater replacement,sewer chokes,new house plumbing and...
TOILET TO BE REFITTED
TOILET TO BE REFITTED