Rough in plumbing for a bathroom

Peter requested 3 quotes from Plumbers in Fitzroy North

  I'm converting an upstairs room into a bathroom.

Hot and cold water is already in the room under the floor .... I have removed sections of the floor boards so access is easy.

The sewer pipes are easily accessible through the wall into a courtyard..... no digging is required as the pipes run along the external wall.

So I need the following:

1. Rough in sewer outlet pipe to the existing sewer pipe.

2. Rough in waste water pipes from a bath and vanity to the existing pipes.

3. Extend water to where the vanity, toilet and bath will be placed.

Please note that you are not required to connect the toilet, vanity and bath to the roughed in work.

Please advise your interest in this job.

Plumbers that Responded

Wade Pham Pty Ltd.

I can highly recommend Rick and his team of Luca and Rocky. For both the quote and work commencement Rick was right on time, the quality of the work was excellent and they cleaned up when the job was complete. I will use Rick again next time i require plumbing work.

· over a year ago

J & G Plumbing Solutions

Jason responded very quickly to arrange a site visit. He was friendly, professional and quickly understood what was required.

Ziggs Plumbing and Roofing

Quote Details

  • Suburb Fitzroy North, VIC 3068
  • Specialisation Home Renovation Plumbing
  • Date Listed 19 Oct 2016 - 8:29 pm

Similar Quote Requests

TO BUILD A BATHROOM ONTO A BEDROOM
A BATHROOM NEEDS TO BE BUILT ONTO A BEDROOM. THEREFORE ALL THE PIPING WORK...

Renovate bathroom
renovate bathroom

Checking of bulging cladding
The cladding on one wall of our house is bulging out at the base and we are...

Install a bath and vanity unit. Bath and vanity already purchused
plumber to install a new bath a vanity unit. vanity unit and bath already...