3rd floor disconnect bath, taps, water, remove bath tiling to be done

Taylor requested 2 quotes from Renovators in Marrickville

  3rd floor apartment bathroom. disconnect bath taps/water, remove bath and retile in remaining cavity (walls and floors). no special tiling required, preferably match (as close as possible) to existing tiles. also need a shower screen fitter (to replace current) (if possible)

Renovators that Responded

Innovative Constructions

Multi Tiling Pty Ltd

Had to call provider first, then provider cancelled appointment 3 minutes prior to the agreed time, after waiting 3 days.

Quote Details

  • Suburb Marrickville, NSW 2204
  • Specialisation Bathroom Renovation
  • Date Listed 12 Nov 2008 - 9:06 am

Similar Quote Requests

Tiling of a bathroom
bathroom tiling approx 18 m2

Bathroom renovation
Remove existing components and tiles etc. Relocate shower over bath and...

RENOVATE BATHROOM
RENOVATE WHOLE BATHROOM PLS CALL AFTER 7PM

I need to replace a shower screen
I need a measure and quote for a new shower screen and for its installation.