Kevin requested 2 quotes from Renovators in Berwick
Direct stick floorboards on plywood sheting to be removed from house currently being renovated. Flooring is glued to plywood base which is then nailed to concrete slab, with a moisuter barrier. Probably a days work for a competant labourer. Own tools will be needed - you choose the method with which the boards are removed to avoid damage to the slab or existing areas.
Small indoor bedroom renovation
2 bedrooms next to each other have dividing wall of builtins. Wanting to see...
Ceiling replacement after water damage, approx 50 sq. m.
Storm damages:
- replace alfresco ceiling 46 sq.m.
- repair WIR ceiling 3...
Bathroom and Kitchen Renovation
Bathroom and Kitchen Renovation
Widening of existing doorway and installation of external bi folds
Removal of existing sliding unit and installation of 3 door bi fold system...