Renovation of 2 BR apartment

Kitty requested 3 quotes from Renovators in South Yarra

  A 2-BR top floor apartment requires general updating, including:
- upgrading existing bathroom (new vanity, toilet, bath re-surface, new shower screen, new floor & wall tiles)
- upgrading existing kitchen (new cabinetry, new appliances, new floor & wall tiles, possibility of changing from a central kitchen to open-plan by removing non-structural walls)
- removal of carpet throughout and either (a) replace with alternate flooring or (b) polish hidden parquetry flooring if in good condition
- painting throughout
- installation of reverse cycle split system subject to body corporate approval
- installation of new lighting
Willingness to provide quotes on individual sections of the jobs preferred.

Renovators that Responded

Optimum Building Services PTY LTD

Marsonia Interiors

Demcon Australia

Quote Details

  • Suburb South Yarra, VIC 3141
  • Specialisation General Renovations
  • Date Listed 15 Mar 2013 - 3:03 pm

Similar Quote Requests

Double storey 3 bed 2 bath apartment renovation in armadale.
i need a fast renovation team to help me to renew this 12 year old apartment...

Need to renovate kitchen and bathroom and a bulit in robe
need to renovate kitchen and bathroom and a bulit in robe

Floating floor and kitchen cabinets
Hi, we need to replace our existing timber flooring and kitchen cabinets....

Construct internal timber stud walls and paint and put downlights
construct new temporary, removable timber stud walls in livingroom and dining...