Douglas requested 3 quotes from Renovators in Lysterfield
The double story house was built in 1992. The house was built on an M class slab, except for 2 piers at the front of the property. In 2009 there was as change to the soil structure that led to a movement in one of the piers at the front of the property. As a consequence has led to
• 2 cracks in wall (as indicated).
• Brickwork pulling away from the stud frame.
Request for Quote for:
• Shore up and support the 2nd storey. [And required scaffolding]
• Remove existing effected the brickwork as indicated
• Advise of any further problems or issues.
o Services in effected general area are: Telephone, Storm Water and Irrigation.
• Excavate and underpin the existing effected footing (as per engineers report)
• Re-fortify the other pier
• Re-confirm the front structure of the house
• Relay the brickwork to the original layout and new brick ties.
• Clean Bricks, Remove scaffolding, shoring and rubbish
Campi Property Services Pty Ltd
Remove/minimise small wall (1.5m wide) in kitchen
We are renovating the kitchen and would like to remove or minimise a small...
Ofiice Renovation, knock down few walls, expand a toilet to include shower
We are moving into an office. Currently have too many walls. We would like...
Renovate existing house
Renovate bathroom, kitchen and some floor renovations
Correct existing paving, new paving, brick wall crack fixing, etc
1. Correct / re-laying of existing paving and add new paving
2. Brick wall...