Tristan requested 3 quotes from Renovators in Flemington
3rd Story flat with old bath (149.5cm x 78.5cm and approx 30cm depth) and vanity (which only consists of basin and mirror) needs to be removed. New same sized bath needs to be installed and connected to plumbing. A new vanity needs to be installed and connected to plumbing. The bath will be purchased new and the vanity is pre-used but will fit the area required. Then tiles that have already been purchased need to be laid on the wall above the bath.
Aaron Valadares
Haruf Constructions & Maintenance
Bathroom reno needed,tiles removed & redone,new taps fitted + vanity
All tiles removed and retiled. new taps fitted. new vanity installed.
WHOLE BATHROOM RENOVATED
PLS CALL
COMPLETE BATHROOM RENOVATION
COMPLETE BATHROOM RENOVATION
Full renvonation. fit only
New tiles, new shower, vanity ? , to fit & supply toilet, 1.5m by 2m, stipped...