Andrew and Sharon requested 3 quotes from Restumpers in Seddon
We are renovating a house which requires re-stumping. floorboards will be already lifted prior to the re-stumping.
- the house floor area is approx 120m2.
-
- we require:
- concrete stumps to replace existing stumps.
- poured concrete pad footings.
- stumps to be securely fixed to bearers, using threaded rod bolts.
- ant caps to be provided between stumps and bearers.
- all work to be in accordance with the relevant building regulations.
- contractor will be responsible for obtaining relevant council building permit.
- floors to be re-levelled to within 15mm after completion of re-stumping.
-
Inspirational Home Enterprises Pty Ltd
3 Room weatherboard (bungalow)
the bungalow has not dropped .
has got the old timber stumps which have gone...
NEEDS SMALL SECTION OF HOUSE RESTUMPED
PLS CALL
Restumping of front end of miner\'s cottage
I would like a written quote for restumping and lifting the front end of a...
Re stump
weatherboard home in footscray
-
- home will be empty and carpets pulled...