Martin requested 3 quotes from Roofers in Blackburn
Replace gutter and downpipes. Single storey unit. (circa 1980)
1. Gutter profile must match existing profile because it joins up with adjoining unit's gutter.
1. Do not add anymore to the length specified because we have over estimated and there is more than enough to cover.
2. Supply and install only. No need to re-paint to match existing. Leave it raw.
3. Three down pipes (X3 spots)
Profile: SQUARE
2.5m drop - Back of unit
2.5m drop - Side of unit
2.3m drop - Front of unit
Allow extra 0.5m per downpipe for bend under eaves
8.8M TOTAL LENGTH
4. GUTTERS (to match existing profile)
11m - Back of unit
9.3m - Side of unit
12.2m - Front of unit
32.5M TOTAL LENGTH
Hyde Plumbing
Didn't not have opportunity to use their service.
All Weather Roofing & Home Improvements
Did not use their service.
Precise Roofing Solutions
New flashing
The flashing that covers the junction of the top storey and the bottom storey...
New gutters
House is 14.3 meters by 8 meters, not including roof overhang. Prefer contact...
Gutter installation
need to replace 10m long of gutter and rectangular nozzle as part of downpipe...
Gutter Repair
Second storey guttering has come apart at the external corner so the bracket...