Rob requested 3 quotes from Roofers in The Gap
Re-screwing required (old screws rusted, metal sheets in good condition). Wanting to insulate at same time (installer will need to be registered with the govt Home Insulation Program & materials used will need to be on the programs approved list - so rebate can be claimed).
Pitched roof means insulation will need to be thin, 35yr old wiring means I wouldn't be too comfortable with loose fill insulation.
2 lengths of new guttering also required (approx 10M and 7M) plus one new downpipe (2.3M).
I'm very flexible on the 1 month approximate commencement time I've given.
ADVANTAGE ROOFING AND GUTTERING PTY LTD
Safely remove flue, replace with ducted whirlybird
Safely remove potbelly stove flue from the ceiling space. Cover the hole in...
Refix roof
Needs bolts to be refastened for colourbond roof
Repair lifting colourbond roof on single storey queenslander
repair lifting colourbond roof on single storey queenslander
Roof flashing and gutter installation to zincalum roof. Single story.
Have extension to house that I need the roof flashing and gutter fitted to....