Get a quote to Troubleshoot Low Performance Issue with Solar PV system.

Bale requested 3 quotes from Solar Energy Specialists in Morang South

  Ever since a power outage (approx 2 months ago), my 4.62kWh 42 panel solar PV system is only working at 33% of the capacity of the solar panels. I suspect that one or more fuses (located in the junction box/s under the panels may have blown). I believe the 42 panels are wired in strings of either 6 or 7 panels, and it seems that only 2 strings are working. Note that my inverter is operating as normal, without any error condition displayed.

Regards,
Bill.

Solar Energy Specialists that Responded

Carbon Electrical Solutions Pty Ltd

I am very happy with the great work that Leigh Richardson did on my solar PV system, and would recommend Carbon Electrical to anyone with similar problems with their Solar PV System. He was prompt, gave me an approx. price upfront, and knew his stuff. Fixed it in no time. My solar system is now back to 100% full production, and I can\'t be happier. Thanks Leigh. See you again sometime.

· over a year ago

Quote Details

  • Suburb Morang South, VIC 3752
  • Specialisation Solar Electricity
  • Date Listed 27 Jan 2012 - 10:50 pm

Similar Quote Requests

Solar panels for home up to 12 panels
Would like quote for Solar EV panels for my house for 12 panels

Solar Electricity
I would like someone to come and provide me with a quote to install solar...

Install 2 rennai solar panel on flat roof flow & return provided
Installation of 2 no. rinnai solar panels on frames to flat roof. panels...

Solar
Hi I need solar HWS and Solar panels for a new home in Warrandtyte. Also pool...