Re-tiling and water-prooving existing shower cabin and shower base

Oleg requested 3 quotes from Tilers in Brighton East

  The old tiles need to be replaced. water-proof membrane is to be installed behind the new tiles.

Tilers that Responded

Richard Zuch Tiler

Quote Details

  • Suburb Brighton East, VIC 3187
  • Specialisation Wall Tiles
  • Date Listed 9 Mar 2011 - 10:44 am

Similar Quote Requests

WALL & FLOOR TILES
BATHROOM TILES TO BE INSTALLED

BATHROOM WALL & FLOOR TILES
BATHROOM WALL & FLOOR TILES

WALLS IN SHOWER RECESS IN BATHROOM TO BE RETILED
WALLS IN SHOWER RECESS IN BATHROOM TO BE RETILED

Tile a new kitchen, meals, bathroom and ensuite
The kitchen, meals, bathroom and ensuite ares are new and have new floors...