Already a Service Central user? Log in here
Waterproof small bathroom before re tiling
Waterproofing: Waterproof Bathroom
in Potts Point, NSW 2011
12 May 2011
Bathroom is in a home unit. Require waterproofing certificate for strata. Bathrrom will be ready for tiling after plumbing is completed
Water proof cement walls as vell as floor in bathroom prior to tiling
Waterproofing: Waterproof Bathroom
in Potts Point, NSW 2011
4 March 2009
Water proofing membrane needed for walls around shower, and vanity. Also water proofing membrane needed for floor for a new bathroom on the ground floor of a Potts Point studio appartment. All...
Waterproofing a bathroom in a unit in prep for tiling
Waterproofing: Waterproof Bathroom
in Potts Point, NSW 2011
5 January 2009
approx 22 square metres of floor and common walls to be waterproofed prior to tiling, a certification of compliance is also required to present to the body corporate and council once work is...
Waterproofing a wet area
Waterproofing: Waterproof Bathroom
in Potts Point, NSW 2011
5 January 2009
waterproofing needed for floor and common walls in a bathroom within a unit, approx 22 square metres.Works also require a certification for body corporate and counil.